Introduction:
Ceramic ball valve's ball, seat and medium flow surface are made of ceramic. It is especially suitable for severe situations requiring wear. It has small switching torque, reliable sealing and long service life.
Features:
• Full bore, reduced bore
•Three pieces (3 pcs)body
• Blow out proof stem designing
• Ceramic: complex ceramic AL2O3, ZrO2
• Size: 1/2" to 8"(DN15 to DN200)
• Pressure: PN16 to PN40, 150LBS to 300LBS
• Operator: manual, lever, worm gear, pneumatic, motorized, electric
Material List:
No. |
Part Name |
ASTM Material |
||||
C.S |
304 |
316 |
304L |
316L |
||
1 |
Body |
WCB |
CF8 |
CF8M |
CF3 |
CF3M |
2 |
Stem |
A276 410 |
A276 304 |
A276 316 |
A276 304L |
A276 316L |
3 |
Ball |
complex ceramic AL2O3, ZrO2 |
||||
4 |
Seat |
complex ceramic AL2O3, ZrO2 |
||||
5 |
Pakcing |
PTFE |
||||
6 |
Medium |
Coal powder, coal cinder, powder particle and other corrosive media |
||||
7 |
Temperature |
304+Graphite≤200°C |
Dimension List:
Dimensions PN16 | ||||||||||||
NPS(inch) |
1/2 |
3/4 |
1 |
1-1/4" |
1-1/2 |
2 |
2-1/2 |
3 |
4 |
5 |
6 |
8 |
DN(mm) |
15 |
20 |
25 |
32 |
40 |
50 |
65 |
80 |
100 |
125 |
150 |
200 |
L |
130 |
140 |
150 |
165 |
180 |
200 |
220 |
250 |
280 |
320 |
360 |
400 |
Dimensions PN25 | ||||||||||||
NPS(inch) |
1/2 |
3/4 |
1 |
1-1/4" |
1-1/2 |
2 |
2-1/2 |
3 |
4 |
5 |
6 |
8 |
DN(mm) |
15 |
20 |
25 |
32 |
40 |
50 |
65 |
80 |
100 |
125 |
150 |
200 |
L |
130 |
140 |
150 |
165 |
180 |
200 |
220 |
250 |
320 |
400 |
400 |
550 |
Dimensions PN40 | ||||||||||||
NPS(inch) |
1/2 |
3/4 |
1 |
1-1/4" |
1-1/2 |
2 |
2-1/2 |
3 |
4 |
5 |
6 |
8 |
DN(mm) |
15 |
20 |
25 |
32 |
40 |
50 |
65 |
80 |
100 |
125 |
150 |
200 |
L |
130 |
140 |
150 |
180 |
200 |
220 |
250 |
280 |
320 |
400 |
400 |
550 |
Applications:
Coal powder, coal cinder, powder particle and other corrosive media
Service:
• Stockiest and Short delivery time
• OEM valve available
• Cheap price
• Customization
FAQ:
• How about quality guarantee period?
It is 18 months.
• Does your factory has any certificate?
Yes, we have ISO9001 and TS certificate.
• What is payment term?
30% T/T in advance, 70% T/T before delivering but after inspection.
http://www.cmdvalv.com/